IT projects fail when they do not meet the following criteria for success:
• It is delivered on time.
• It is on or under budget.
• The system works as required.
Only a few projects achieve all three. Many more are delivered which fail on one or more of these criteria, and a substantial number are cancelled having failed badly.
1. Lack of User Involvement
Lack of user involvement has proved fatal for many projects. Without user involvement nobody in the business feels committed to a system, and can even be hostile to it. If a project is to be a success senior management and users need to be involved from the start, and continuously throughout the development. This requires time and effort, and when the people in a business are already stretched, finding time for a new project is not high on their priorities.
2. Long or Unrealistic Time Scales
Long timescales for a project have led to systems being delivered for products and services no longer in use by an organization. The key recommendation is that project timescales should be short, which means that larger systems should be split into separate projects. There are always problems with this approach, but the benefits of doing so are considerable.
3. Poor or No Requirements
Many projects have high level, vague, and generally unhelpful requirements. This has led to cases where the developers, having no input from the users, build what they believe is needed, without having any real knowledge of the business. Inevitably when the system is delivered business users say it does not do what they need it to. This is closely linked to lack of user involvement, but goes beyond it. Users must know what it is they want, and be able to specify it precisely. As non-IT specialists this means normally they need skills training.
4. Scope Creep
Scope is the overall view of what a system will deliver. Scope creep is the insidious growth in the scale of a system during the life of a project. As an example for a system which will hold customer records, it is then decided it will also deal with customer bills, then these bills will be provided on the Internet, and so on and so forth. All the functionality will have to be delivered at one time, therefore affecting time scales, and all will have to have detailed requirements. This is a management issue closely related to change control. Management must be realistic about what is it they want and when, and stick to it.
5. No Change Control System
Despite everything businesses change, and change is happening at a faster rate then ever before. So it is not realistic to expect no change in requirements while a system is being built. However uncontrolled changes play havoc with a system under development and have caused many project failures.
This emphasizes the advantages of shorter timescales and a phased approach to building systems, so that change has less chance to affect development. Nonetheless change must be managed like any other factor of business. The business must evaluate the effects of any changed requirements on the timescale, cost and risk of project.
6. Poor Testing
The developers will do a great deal of testing during development, but eventually the users must run acceptance tests to see if the system meets the business requirements. However acceptance testing often fails to catch many faults before a system goes live because:
Conclusion
These six factors are not the only ones that affect the success or failure of a project, but in many studies and reports they appear near, or at the top of the list. They are all interlinked, but as can be seen they are not technical issues, but management and training ones. This supports the idea that IT projects should be treated as business projects.